The permit process: Step 2 filing paperwork

On October 17th we received the structural engineering report. The good news was that the foundation of the home  is solid and that we can put all of our focus on the framing and structure of the home.

We submitted the report with a permit request form and some of the drawings to the city building inspector.

She responded with the message that she was missing some details on the front porch rebuild.

This requires a lot more effort than I throughout it would, and I have to spend some time on the research.