The Big North Wall Construction Project (Part 3)

Step 4: Demolishing the north wall and lower roof.
Originally intended to be started and done in April, our contractor started working on this portion of the project on Thursday April 30th. He called me mid-morning to ask if I was OK wit him removing the floor as well, since the joists were all rotted at the connection to the foundation. See these pictures he sent me.

PART_1430420087203_KIMG0245 PART_1430420084900_KIMG0246 PART_1430420089352_KIMG0247

Before the day was over, our contractor called us and shared some pictures with us regarding the state of the foundation. In short, it was in no shape to be used for new construction. We had no provision in the plan to build a new foundation, so the project came to a grinding halt.

Have a look at these pictures and we hope that you’ll come to the same conclusion that these foundation walls were in no shape to be used again.

PART_1430431570054_KIMG0252 PART_1430431567562_KIMG0251PART_1430431565278_KIMG0250PART_1430431562986_KIMG0249

.